Westwood Point, Thanet

Full Civils Design for current phases comprising of 578 dwellings

About This Project

Location:

Westwood Point, Thanet

Extending over eight Planning Phases, compressed to six Construction Phases, Withers Design Associates have been involved in this scheme since Pre-acquisition Due Diligence in 2016, right through to the Construction start of the final Phase in 2024.

Comprising of circa 800 dwellings, a Care Home and Local Facilities, the Development started as a mix of Private and Affordable Housing, and Apartments, but was adapted to mostly Shared Ownership and Rental accommodation to move with the changing markets over its 8-year span.

Each Phase presented its own challenges with surface water discharged to ground by a variety of infiltration techniques, diverted High Voltage cables to negotiate as well as a National Grid pylon and overhead cables. Cut & Fill became more of an issue as the scheme progressed with levels reconsidered on a rolling Phase basis to ensure sustainable construction.

A Long Term Solution

Withers Design Associates have been involved in The Westwood Point, Thanet scheme since Pre-acquisition Due Diligence in 2016, right through to the Construction start of the final Phase in 2024.

2016 - 2024

Civil Engineering Design

Cut & Fill

Challenges addressed for a Rolling Phase Build

800

Dwellings across 8 Planning Phases

“Withers have provided professional engineering services to Vistry for a number of years and have been an important part of the success in a number of Vistry projects.”
Vistry, Regional Technical Director Vistry Group